Skip to content
Journal

Seven production questions to ask your venue

Rigging, power, load-in and curfew — the questions that decide whether a design can be built.

Published · By Moad Alodeh

A chain hoist and truss secured at a ceiling rigging point

A venue can look perfect on a site visit and still limit what can be built inside it. These questions, asked before signing, save difficult compromises later.

  • Where are the rigging points, and what load can each carry?
  • What power is available, where, and is a generator allowed or required?
  • How many hours are allowed for load-in before the event and de-rig after it?
  • Are there restrictions on open flame, haze, confetti or pyrotechnics?
  • What is the sound limit, and at what time must music end?
  • Which suppliers are mandatory in-house, and which can be brought in?
  • What access is there for large structures — doors, lifts and service routes?

Why the answers matter

Rigging and power decide the lighting design. Load-in time decides how ambitious the build can be — a full ceiling installation or a large custom kosha may need a day or more. Access routes decide how structures are fabricated, often in sections sized to fit a service lift.

When design and production are planned together, these limits become part of the brief rather than surprises in the final week.